Year of Operation
July 1995
Location of Project
No. 78/54 and 78/12 Moo 9, Pattaya Sai 2 Road, Nong Prue Sub-District, Banglamung District, Chonburi Province
Details of Central Marina Project
Year Acq.
2021
Lease End
April 2035
NLA (sq.m.)
Occ. Rate
%

Characteristic of Investment

  1. Leasehold/sub-leasehold rights over immovable properties from Central Pattana. These will comprise building areas (partial), common areas, and parking areas which are related to the Project. Non etheless, the leased properties are exclusive of areas leased out to tenants who have made rental payments on a long-term basis and relevant parking areas.
  2. Leasehold rights over utilities systems from Central Pattana. These will comprise electrical system, utilities system, telephone system, elevators, escalators, air conditioning system, engineering works system, wastewater treatment system, and various facilities that have been installed and used in the building and structures of the Project, along with other rights relating to or in connection with the aforementioned systems.
    For approximately 14 years (the leasehold/sub-leasehold rights will end on 30 April 2035)
  3. Ownership of movable assets from Central Pattana, which will comprise equipment for decoration, tools, instruments, whether are permanently fixed or not, including other equipment used for the purpose of decorating or facilitating users of the building and structures of the Project, which are located on and/or fixed on the exterior or in the interior of the areas of the building and structures of the Project, or on the surface of the building and structures of the Project, and/or in the leased areas occupied by tenants in the building and structures of the Project, including any other rights relating to or in connection with the aforementioned properties (as the case may be), excluding the properties that are component parts of the building and structures.

Property Manager
Central Pattana
Investment Date
25 February 2021
Building Area

Gross Floor Area (include parking area) approximately

sq.m.

Gross Leasable Area approximately 15,453 sq.m.

Investment Value

THB million

Project Overview
The project has a 3-storey building and a 2-storey building without basement.
Whistleblowing